Powder Metallurgy Sintered Double Components Gears Metal Transmission Gear

Product Details
Customization: Available
Pressing Speed: Isostatic Pressing
Suppression Method: Bidirectional Pressurization
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Diamond Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
500000 RMB
Plant Area
1001~2000 square meters
  • Powder Metallurgy Sintered Double Components Gears Metal Transmission Gear
  • Powder Metallurgy Sintered Double Components Gears Metal Transmission Gear
  • Powder Metallurgy Sintered Double Components Gears Metal Transmission Gear
  • Powder Metallurgy Sintered Double Components Gears Metal Transmission Gear
  • Powder Metallurgy Sintered Double Components Gears Metal Transmission Gear
  • Powder Metallurgy Sintered Double Components Gears Metal Transmission Gear
Find Similar Products

Basic Info.

Model NO.
DYPMG-23571
Application
Mechanical Gadgets, Aerospace, Auto Parts, Electric Appliances, Medical Apparatus, Bag Accessories, Watch & Jewelry
Bush Types
Large Transmission Gear
Certificate
Rosh
Density
6.5-7.1 g/cm3
After-Sales Service Provided
Online Support
Process
Mold Shaping, Sintering
Item Name
Metal Powder Metallurgy Products Sintered Gears
Applicable Industries
Machinery Repair Shops, Manufacturing Plant
Place of Origin
Guangdong, China
Condition
New
Machinery Test Report
Provided
Surface Finish
Steam Treatment
Transport Package
Plastic Bag\Carton
Specification
Made to Order
Trademark
OEM
Origin
China
HS Code
8483900090
Production Capacity
3000000pieces/Month

Packaging & Delivery

Package Size
50.00cm * 40.00cm * 20.00cm
Package Gross Weight
15.000kg

Product Description

Product type Sintered Getal Gears / Large Transmission Gear
Material Stainless steel,Steel(Iron,)Brass,Copper
Tolerance ±0.01mm
Application Transmission Case \ Touring Car \ Motorcycle \ Dirt Bike
Shape Custom
QC system 100% inspection before shipment
Payment terms T/T at sight, Paypal, World First,etc.
Lead time 7-15 working days
Why Choose Us

1.  We have professional powder metallurgy production equipment and team;
2.  We can accompany customers to develop products;
3.  Just send an idea that you want to try, you don't even need to know what powder metallurgy;
4.  Our sales will reply you within 24 hours to confirm further details and give the estimated quote time;
5.  Our team will evaluate your inquiry and provide our offer within next 1~3 working days.
 
Order Process
1.  You send us drawing or sample.
2.  We carry through project assessment.
3.  We give you our design for your confirmation.
4.  We make the sample and send it to you after you confirmed our design.
5.  You confirm the sample then place an order and pay us deposit.
6.  We start producing.
7.  When the goods is done, you pay us the balance after you confirmed pictures or tracking numbers.
8.  Trade is done, thank you!!

Powder Metallurgy Sintered Double Components Gears Metal Transmission GearAdditional Capabilities CAD Design Services CAM Programming Services Coordinate Measuring Machines (CMM) Reverse Engineering
Product Show
Powder Metallurgy Sintered Double Components Gears Metal Transmission Gear
Powder Metallurgy Sintered Double Components Gears Metal Transmission GearPowder Metallurgy Sintered Double Components Gears Metal Transmission Gear
Some Parts We Manufacture
Self-Lubricated Bushing
Powder Metallurgy Sintered Double Components Gears Metal Transmission GearStructural Parts
Powder Metallurgy Sintered Double Components Gears Metal Transmission GearGears
Powder Metallurgy Sintered Double Components Gears Metal Transmission Gear
About Us
DERYOUNG Technology company is a professional metal parts manufacturer, which with more than 20 years of experience in the development and production of sintered metals. Each year we produce more than 100 million premium sintered metal parts for our customers. We are mainly produce oil bearing, gear, and metal parts. We support our customers in the design and material selection of sintered parts, providing the best solution for your applied parts through our specialized equipment compression molds, furnaces, handling, sizing, deburring and impregnation processes.
Powder Metallurgy Sintered Double Components Gears Metal Transmission Gear
 
Powder Metallurgy Sintered Double Components Gears Metal Transmission Gear
Powder Metallurgy Sintered Double Components Gears Metal Transmission Gear
Powder Metallurgy Sintered Double Components Gears Metal Transmission Gear
Powder Metallurgy Sintered Double Components Gears Metal Transmission Gear
Powder Metallurgy Sintered Double Components Gears Metal Transmission Gear
Powder Metallurgy Sintered Double Components Gears Metal Transmission Gear
Powder Metallurgy Sintered Double Components Gears Metal Transmission Gear
Powder Metallurgy Sintered Double Components Gears Metal Transmission Gear
Design Tips: Powder Metallurgy Gears

1.  Radius > 0.25 mm is required to manufacture the die;
2.  Helical teeth should feature a helical angle < 30º in order to limit side pressure on the punches;
3.  Introduction of a draft angle > 5º in the upper diameter reduce the tooling cost;
4.  The distance between tooth root and central hub diameter must be: > 3 mm (Robust Tooling).

If you want to know more about the product, please send us a message.
 
FAQ
Q: How can I get the quotation?
A: Please send us information for quote: drawing, material, weight, quantity and request,w can accept PDF, ISGS, DWG, STEP file format.
   If you don't have drawing, please send the sample to us,we can quote based on your sample too.
 
Q: What's your MOQ?
A: In general 1000pcs,but can accept low quantity in some special conditions.
 
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
 
Q: What about the leading time for mass production?
A: Honestly, it depends on the order quantity. Normally, 15 days to 20 days after your deposit if no tooling needed.
 
Q: What if the parts are not good?
A: We can guarantee good quality,but if happened,please contact us immediately, take some pictures, we will check on the problem,and solve it asap.
 
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now