Product type |
Sintered metal parts / Planetary Sun Drive Spur Gea |
Material |
Stainless steel,Steel(Iron,)Brass,Copper (According to product design requirements) |
Tolerance |
±0.01mm |
Surface Treatment |
As your requirement |
Application |
Tool industry,Automotive, instrument, electrical equipment, household appliances, furniture, mechanical equipment,daily living equipment, electronic sports equipment, light industry products, sanitation machinery, etc. |
Shape |
Any other material and dimension depends on customers' demand. |
QC system |
100% inspection before shipment |
Returned Goods Managing |
With quality problem or deviation from drawings |
Warranty |
Replacement at all our cost for rejected products |
Payment terms |
T/T at sight, Paypal, Western Union,etc. |
Lead time |
7-15 working days as usual,It will based on the detailed order quantity. |
1. We have professional powder metallurgy production equipment and team;
2. We can accompany customers to develop products;
3. Just send an idea that you want to try, you don't even need to know what powder metallurgy;
4. Our sales will reply you within 24 hours to confirm further details and give the estimated quote time;
5. Our team will evaluate your inquiry and provide our offer within next 1~3 working days.
1.
You send us drawing or sample.
2. We carry through project assessment.
3. We give you our design for your confirmation.
4. We make the sample and send it to you after you confirmed our design.
5. You confirm the sample then place an order and pay us deposit.
6. We start producing.
7. When the goods is done, you pay us the balance after you confirmed pictures or tracking numbers.
8. Trade is done, thank you!!
Additional Capabilities CAD Design Services CAM Programming Services Coordinate Measuring Machines (CMM) Reverse Engineering
Some Parts We Manufacture |
The Powder Metallurgy Manufacturing Process |
FAQ |
Q: How can I get the quotation? |
A: Please send us information for quote: drawing, material, weight, quantity and request,w can accept PDF, ISGS, DWG, STEP file format.
If you don't have drawing, please send the sample to us,we can quote based on your sample too. |
|
Q: What's your MOQ? |
A: In general 1000pcs,but can accept low quantity in some special conditions. |
|
Q: Do you provide samples ? is it free or extra ? |
A: Yes, we could offer the sample for free charge but do not pay the cost of freight. |
|
Q: What about the leading time for mass production? |
A: Honestly, it depends on the order quantity. Normally, 15 days to 20 days after your deposit if no tooling needed. |
|
Q: What if the parts are not good? |
A: We can guarantee good quality,but if happened,please contact us immediately, take some pictures, we will check on the problem,and solve it asap. |
|
Q: What is your terms of payment ? |
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment |